It consults your systems.
MES, LIMS, CMMS, ERP, the warehouse. Each step reaches only the system it was given. Eleven of the fourteen steps call no model at all.
Run, manage and improve the workflows that can't go wrong. The same path every time, checked at every step, with the cost, the speed and the proof on the record.
This is everything that happens next. AgentFlow reads from five systems, puts eleven agents to work at once, stops twice to ask a person, and writes back to four systems. Then it files the report.
MES event. Batch B-24817 on line 3 fails viscosity at final QC.
Recipe R-112, reactor 3B, 41 parameters, two operators.
Viscosity 4,310 cP against a limit of 4,200. Check passed: results present and signed by the lab.
Drifting upward for three batches. This one crossed the line.
Reactor 3B serviced May 30. Viscometer calibration valid to August, so the re-test branch is skipped. Check passed: instrument error ruled out.
Seven lots went in. One is common to all three drifting batches: additive lot L-7731.
Eleven batches, checked by eleven agents at once. Four in the warehouse, two scheduled, one shipped, four cleared by their own lab results.
Lot L-7731 arrived with moisture at the top of its allowed range. Check passed: every claim cites a record.
Hold four batches. Quarantine what is left of the lot. Flag the shipped batch for customer notice. Plan frozen: 9f2c.
No answer in 15 minutes, so it escalated. The plant quality manager approved at 03:02.
Four batch holds and one lot quarantine written back. Exactly the frozen plan, nothing more.
"Two more batches are scheduled with this additive. Switch to lot L-7802, or pause line 3?" Answer at 03:14: switch.
Two production orders moved to lot L-7802.
Request SCAR-0419 opened with the evidence attached. The supplier's quality contact notified.
Report DEV-2291 filed: findings, charts, every record ID. Posted to #quality-line3. Run written to the ledger.
Four minutes of work and thirty-four minutes of waiting for people. Done by hand, this is a morning's work for a quality engineer, and it starts when they arrive; by then the two scheduled batches have already run. Illustrative run drawn from the specialty-chemicals use case.
Nothing in those fourteen steps is improvised. The path was fixed before the batch ever failed. Four things make that possible.
MES, LIMS, CMMS, ERP, the warehouse. Each step reaches only the system it was given. Eleven of the fourteen steps call no model at all.
Eleven batches shared the suspect lot. Eleven small agents checked them at once, and their results folded into one table before the next step began.
Once for a signature, once for a decision. When the quality lead did not answer in fifteen minutes, it escalated. The run waited, and would have waited for days.
Holds, a quarantine, a schedule change, a corrective action. Each plan was frozen before approval, so what ran is exactly what was signed.
Success for a workflow that matters is not one thing. It has to be right, the same every time, fast enough, worth what it costs, and provable afterward.
Every step is checked before the next one begins. It stops before it publishes a number it can't prove.
The path is fixed before the run starts. Same steps, same order, every time.
Independent work runs at once. Forty-two suppliers reviewed in 14.8 seconds on the benchmark workflow.
You know what a run costs before you commit. As runs pile up, it proposes cheaper models, step by step.
Every query, tool call, approval and cent goes on the record. Any number can be traced to its source.
Writing a workflow is day one. AgentFlow is built for every day after that.
A trigger is one record: a schedule or a webhook, with input mapping and retries. One event can start ten workflows. Independent steps run at once, up to 256 at a time. State is checkpointed, so a run survives a restart and can wait days for a person.
Every change is saved as a new version. Every run shows what it cost, step by step. Approvals carry timeouts and escalation paths. The ledger keeps every run, so "what happened on March 3?" has an answer.
After a few runs, AgentFlow studies them and proposes changes, usually a cheaper model on one particular step, with the expected effect on cost and speed at the same accuracy. You take them one at a time, or not at all.
The quality lead described that workflow in a paragraph. AgentFlow wrote the steps, picked the tools, and showed her the draft. She changed it the same way, a sentence at a time, with no code, no engineering ticket, and a new version saved every time.
When a batch fails final QC, investigate it, contain it, and open a corrective action with the supplier. Ask the quality lead before anything is held.
Drafted 14 steps across MES, LIMS, CMMS, ERP, WMS and QMS. Three call a model, two wait for a person, four change something. Review them?
If the viscometer's calibration has expired, re-test before doing anything else.
A rule stated in one sentence becomes a branch the run has to take.
Each one told step by step: what starts it, what runs, what is checked, and what arrives.
For quality. The run on this page, with who owns it and what it replaced.
Read moreFor finance. Every account over the threshold, explained from the journals, with the document IDs.
Read moreFor procurement. Forty-two suppliers reviewed at once, one ranked summary in Slack.
Read moreThe run stops at that step and says which one and why. It does not carry on with half an answer. Steps carry checks: the shape of the output, a file that must exist, a total that must reconcile. They also get a retry, prompted with exactly what was missed.
Yes. A workflow can pause for a named person and reach them in Slack, by email or in the product. Approve and it continues. Decline and it stops. Approvals carry timeouts and escalation paths, so a run never hangs on someone who is asleep.
Yes, carefully. A step that changes something plans the change, freezes that plan with a fingerprint of its inputs, routes it for approval, runs only on approval, and then writes an append-only record. Operational sources are read-only unless you say otherwise.
Yes, and that follows from the path being fixed. The steps are known in advance and most of them don't call a model, so cost per run is a number you can see while you write the workflow and hold to afterward.
No. The people who own the process change it in chat, in a sentence, and every change is saved as a new version. AI engineering keeps control of the models, the tools and the boundary, and reviews whatever it chooses to review.
We will show you how it would run on AgentFlow: which systems it would touch, where it would stop to ask, and what each run would cost.
Read the docsAn actual person replies, usually within one working day.